Wall Covering Installation
Textured panels, hand-cut and seam-matched.
1–2 days per room2 installersFrom 22 KWD/m²
Materials
- Linen panels
- Adhesive
- Trim mouldings
Process
From room to finish.
01
Consult
Material, seam plan, trim choice.
02
Measure
Wall plan with seam-out.
03
Prep
Substrate skim and prime.
04
Install
Hand-cut, seam-matched, pressure-rolled.
05
Detail
Trim, finish, snag-list walk-through.
Two-year workmanship guarantee.
Every project is signed off by the lead applicator. If anything in our application fails within the guarantee window, we return and remedy at no cost.
Ready when you are.
48-hour quote turnaround. Site visit included. Kuwait City, Sun–Thu.