Microcement Application
Seamless mineral surfaces for floors, walls and wet areas.
3–7 days per room2–3 craftspeopleFrom 38 KWD/m²
Materials
- Microcement base
- Mineral pigment
- Polyurethane top coat
- Silicate primer
Process
From room to finish.
01
Consult
A conversation about the room, the substrate, the intent.
02
Measure
AR-assisted or on-site survey. Every surface, every prep note.
03
Prep
Levelling, priming, and a controlled environment.
04
Apply
Two-coat troweled microcement, hand-burnished.
05
Seal & Aftercare
Two-component sealer + care kit. One revisit included.
Two-year workmanship guarantee. One revisit at twelve months.
Every project is signed off by the lead applicator. If anything in our application fails within the guarantee window, we return and remedy at no cost.